PLAN / INSTALL / MAINTAIN

A clear plan.
A confident start.

A modular system simplifies assembly. Good site preparation and an agreed installation plan make the difference.

A clear plan. A confident start.

From the first measurement to the final tile.

01

Assess your site

Confirm the intended activity, dimensions, substrate condition and drainage. The base should meet the current installation guidance for the product and application.

02

Confirm the layout

Agree colours, markings, transitions and quantity. Include a project-appropriate allowance for cuts and replacement stock.

03

Install the modular surface

Follow the supplier’s current instructions for connections, perimeter clearances and temperature conditions. Confirm expansion requirements before laying the floor.

04

Inspect and maintain

Keep the surface clear of debris, inspect connections and drainage, and replace damaged tiles. Test cleaning products on a small area and follow supplier guidance.

LET’S BUILD YOUR SPACE

A better surface starts
with a conversation.

Discuss your project ↗